Most viewed - Work on Main Railing - Fischersplace.com Photo Gallery

 Fischersplace.com Photo Gallery

Photos from the collection of the Fischer Family
Home > Our Home > Projects > New Railings (2004)
Work on Main Railing
Next work began on the angled railing.  First, the bottom newel post was cut to length and installed with lag screws into the framing of the stairway.  Next, a new oak board was ripped to proper width, and mitered to fit over the top of the stairway framing.  Finally, the bottom shoe rail was installed on top of this board.

Work on Main Railing

Next work began on the angled railing. First, the bottom newel post was cut to length and installed with lag screws into the framing of the stairway. Next, a new oak board was ripped to proper width, and mitered to fit over the top of the stairway framing. Finally, the bottom shoe rail was installed on top of this board.

IMG_0409.JPG IMG_0415.JPG IMG_0407.JPG IMG_0400.JPG IMG_0410.JPG
Rate this file (No vote yet)
File information
Filename:IMG_0407.JPG
Album name:tfischer / New Railings (2004)
Filesize:61 KiB
Date added:Mar 30, 2008
Dimensions:640 x 854 pixels
Displayed:469 times
DateTime Original:2004:02:08 19:18:52
Digital Zoom Ratio:1
EXIF Image Height:854 pixels
Exposure Time:1/60 sec
FlashPix Version:version 1
Make:Canon
Max Aperture:f/2
Model:Canon PowerShot G3
Resolution Unit:Inch
X Resolution:180 dots per ResolutionUnit
Y Resolution:180 dots per ResolutionUnit
YCbCrPositioning:Center of Pixel Array
URL:http://photos.fischersplace.com/cpg/displayimage.php?pid=1679
Favorites:Add to Favorites