Last additions - Fischersplace.com Photo Gallery

 Fischersplace.com Photo Gallery

Photos from the collection of the Fischer Family
Home > Our Home

Last additions - Our Home
shed9.jpg
CleanupThe intensity of the rain increased quickly, so I snapped one final picture of Cathy bringing in the last of the tools and supplies. Now that framing is essentially complete (other than the gable framing mentioned above) the next task is to hang the plywood siding and roof sheathing.
Mar 31, 2008
shed8.jpg
Shed Rear FramingHere's a view from the rear of the shed. The trusses made roof construction simple -- just place them and nail them up (bracing them temporarily with some scrap wood). At this stage the gables still need to be framed out a bit wider so there will be a slight overhang on the gable ends.
Mar 31, 2008
shed7.jpg
Framing FinishedWe didn't pause to take any other photos-- this one shows where we stopped for the day when rain started falling. The front of the building will have a roll-up door and a window (being demonstrated by Cathy). We made good progress before the rain-- getting all the walls framed and trusses up and temporarily braced.
Mar 31, 2008
shed6.jpg
FramingCathy and I started framing on Friday, and on Saturday we were joined by friend Mike Becker who helped us frame the remaining walls, set them up, and set the roof trusses. This picture was taken relatively early on Saturday, after we raised the side and back walls and braced them into position. A pneumatic framing nailer was loaned to us by friends Aaron and Dawn Lundeen, and made the job infinitely easier and faster.
Mar 31, 2008
shed5.jpg
Lumber StashAnother photo of the "lumber stash". You can see the large pile of studs, pile of roof trusses and header boards, and the big pile of roof sheathing and siding.
Mar 31, 2008
shed4.jpg
Building MaterialsHowever, the following weekend was our "framing blitz". We prepared for it Thursday by picking up a ton of building materials at Menards. Here is a photo of many of the building supplies sitting in our garage Thursday night. Sorry for the poor quality -- the digital camera we had at this time took lousy flash photos.Mar 31, 2008
shed3.jpg
Finished FoundationThe finished foundation! The plywood went on very smoothly, and then we cleaned up the large piles of dirt excavated from under parts of the foundation. Finally, Tim got out the ladder to prune back some low-hanging tree branches in preparation for the rest of the building's construction. For the remainder of the week, we had a nice "raised wooden patio" as time commitments, as well as the weather, didn't allow us to get any further with building.
Mar 31, 2008
shed2.jpg
Shed Foundation with BaileyFraming itself for the foundation went quite smoothly, once we had the rim joists leveled and squared. In this picture, Cathy double-checks everything before we lay down the plywood on top, as Bailey looks on. The building is next to Bailey's outdoor run, but the run is plenty long so that it's not blocking much of his view.Mar 31, 2008
shed1.jpg
FoundationThe hardest part about the foundation was getting it all level. We laid out a level reference line over what we thought was level ground, but it ended up having about a 10" slope. Since we are building under several trees, height was a concern. We ended up excavating a lot of dirt to level out the site.
Mar 31, 2008
IMG_0424.JPG
Completed rails after finishingThe view from the entry foyer. Here, you can also see the new oak railing leading downstairs. Since this picture was taken, we have replaced the carpeting you see here with new as well.Mar 30, 2008
IMG_0423.JPG
Completed rails after finishingAnother view from the top, looking at the other top railing.
Mar 30, 2008
IMG_0416.JPG
Completed rails before finishingAnother view of the completed railing. If you look carefully to the left of this picture, you will see the almond wrought-iron railing leading downstairs. This railing was also replaced, but not at the time this picture was taken.Mar 30, 2008
160 files on 14 page(s) 6