During: Sink/counter area
|
|
Another view of the sink area and back wall in-progress.
|
|
 |
|
During: Tub AreaThe tub area is mostly tiled. Evidently I got lazy and saved the "hard" bevel cuts on the bullnose trim for after this picture was taken...
|
During: Back wallHere the back wall is mostly tiled (except around the paper holder) and new "corner shelves" are being installed.
|
During: Sink/counter areaAnother view of the sink area and back wall in-progress.
|
During: Tub areaAnd still another picture. The hole above the gray underlayment is where the shower head will attach.
|
During: Sink/counter areaAt this stage we've removed all the tile from the room (except for behind the toilet, which we tried to keep in service as long as possible), tore out the old countertop, installed the new sink/countertop, and tiled the entire tub area and back wall. The mirror was removed to protect it during tile removal.
|
|
|
 |