During: Tub area
|
|
Yet another picture of the tub surround underlayment.
|
|
 |
|
In-progress: The tub areaAt this stage of the picture we had torn out the walls from the tub area, plumbed in a new shower valve, and lined the walls with Hardibacker underlayment.
|
During: New tub surroundHere's the rear of the tub area. As you can see, we removed the old tile from the entire bathroom, and were able to avoid putting in new sheetrock outside of the tile area (once we cleaned up a bit better after this picture).
|
During: Tub areaYet another picture of the tub surround underlayment.
|
During: Tub areaOne final picture at this stage: you can catch a glimpse of the old carpet here (man that stuff was nasty/toxic to remove)
|
During: Sink/counter areaAt this stage we've removed all the tile from the room (except for behind the toilet, which we tried to keep in service as long as possible), tore out the old countertop, installed the new sink/countertop, and tiled the entire tub area and back wall. The mirror was removed to protect it during tile removal.
|
|
|
 |